Main features and project development

Go back

A 170MW Integrated Solar Combined Cycle (ISCC) plant

The plant configuration includes the following elements:

  • A solar field of aproximately 800,000 square meters with aluminium parabolic troughs,that will generate annually more than 1,000 GWh t.

 

  • A high performance power block, with a robust HRSG, combining a steam turbine of 68 MW with a gas turbine of 114 MW which uses as fuel Natural Gas (NG).

 

 

  • A molten salt thermal storage system capable of operating the steam turbine at full load for 12 hours after sunset

 

 

 

 

Timeline (estimates):

Development and construction/ Maximum terms

  • Feasibility study/ June 2013
  • Basic engineering project and financial model/ August 2013
  • Confidentiality agreement and letter of intent subscription rights for energy/ September 2013
  • Pre-contract or “Term sheet”/ January-February 2014
  • Detailed engineering and processing and administrative permits/ July 2014
  • PPA contract and financial closing/ November-December 2014
  • Construction start/March 2015

 

Operation

  • Start/ March-April 2017
  • Production of clean electricity/ 25 years

Total development, construction and supply 48 months


Photo gallery

Click to enlarge

An ISCC plant, with high dispatchability and flexibility in its operation, which will be capable of generating more than 1,400 GWh per year, at a very competitive price.